Close Menu
  • News
  • Featured
  • Electric Cars
  • Luxury Cars
  • Reviews
  • Advice

Subscribe to Updates

Get the latest creative news from Motor Fortune about Electric Cars, Luxury Cars, design and More.

What's Hot

Mercedes’ EV Charging Network Hit 100 Locations After 3 Years In The U.S.

November 10, 2026

Unit1 FARO and Neon review: I just found my new favorite e-bike helmets

November 10, 2026

PlugShare Gets A Major Redesign, Adds Dark Mode And iPhone Duo Support

November 10, 2026
Facebook X (Twitter) Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
Facebook X (Twitter) Instagram
Motors MachineMotors Machine
  • News
  • Featured
  • Electric Cars
  • Luxury Cars
  • Reviews
  • Advice
Motors MachineMotors Machine
Electric car

Rivian’s Mind Robotics snags Doug Field, ex-Tesla and Ford EV chief

SofiaBy SofiaOctober 14, 2026No Comments5 Mins Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit Email
Share
Facebook Twitter LinkedIn Pinterest Email


Rivian Q1 2025

Source: Rivian

Doug Field, the engineer who ran Tesla’s Model 3 program and later Ford’s entire EV operation, is now president of Mind Robotics, the industrial robotics startup Rivian CEO RJ Scaringe spun out of Rivian last year.

He lands at a company that has now raised more than $1 billion in under a year, and he’ll run product, engineering, and operations alongside Scaringe.

Field’s next job is robots

Field’s résumé reads like a tour of the most ambitious hardware programs in the industry. He was Tesla’s SVP of Engineering through the Model 3 launch, ran Apple’s car effort inside its Special Projects Group, and then spent nearly five years at Ford as chief EV, digital and design officer.

We reported in April that Ford was folding Field’s EV group into manufacturing as he left the company. Ford didn’t replace him with an outside hire, and his department ended up under COO Kumar Galhotra. Five months later, he has his next job.

Advertisement – scroll for more content

In Mind’s announcement, Scaringe called Field “a remarkable leader with a track record of delivering new technologies in successful products,” adding that’s “exactly what Mind needs as we deploy robots into real factories and beyond.”

Field called the combination of AI and robotics “one of the most important—and difficult—engineering challenges of our time.”

A $1 billion war chest and a factory to practice in

Mind Robotics first surfaced as part of Rivian’s Q3 2025 earnings report, with a $115 million seed round led by Eclipse. The money has piled up fast since then:

  • $115 million seed, led by Eclipse (late 2025)
  • $500 million Series A, co-led by Accel and Andreessen Horowitz (March 2026)
  • $400 million round led by Kleiner Perkins (May 2026), which Reuters reported valued Mind at $3.4 billion

That’s roughly $1 billion for a company that hasn’t shown a product publicly. Mind says it’s building foundation models plus “purpose-built” robot hardware for dexterous manufacturing work. It hasn’t said whether any of that hardware is humanoid.

Mind’s real edge is its access. Rivian is a major shareholder and its launch customer, which gives the startup a live, high-volume auto plant to collect training data and deploy robots in. And that plant is busy: the R2 is ramping in Normal, Illinois, and Rivian delivered 19,248 vehicles in Q3 alone.

The Tesla comparison is unavoidable

Field’s hire puts Mind on a direct collision course with the program Tesla now uses to justify much of its valuation: Optimus.

Tesla’s track record there isn’t great. Elon Musk predicted about 10,000 Optimus robots built in 2025, with roughly 1,000 doing useful work in Tesla factories by year-end. In January, he admitted none were doing “useful work.” Tesla then ended Model S and Model X production at Fremont to convert those lines for Optimus, and it has pushed back the Optimus V3 reveal repeatedly. In July, Musk said production would be “extremely slow at first”.

Mind is taking a quieter route. No stage demos, no unit targets. Just robots trained on a real assembly line, with a customer that already owns a stake in the company.

Electrek’s Take

This is a smart hire.

Field is a hardware industrialization guy. That’s his whole career: taking a product that works in a lab and making it work at volume. The Model 3 got to mass production on his watch. It was messy, and he took a leave at the height of “production hell” in 2018 before leaving Tesla, but the car shipped and became the best-selling EV in the world for years.

His record since then is more mixed. The Apple car was canceled after he left. At Ford, Model e lost more than $5 billion in 2024 alone, and the company has since scaled back its EV ambitions. But the low-cost Universal EV Platform and the $30,000 midsize pickup coming out of Louisville in 2027 are his team’s work, and that’s the most promising thing Ford has going in EVs.

So why does Mind need him? Because foundation models are the easy part to fundraise on. Getting robot hardware reliable enough to run shifts in a car plant is where everyone, Tesla included, has struggled.

It also tells us how serious Scaringe is about this. He’s running Rivian through the most important launch in its history, plus Also and now Mind. Bringing in a president with Field’s profile is how you keep Mind from becoming a side project while focusing your needed attention on Rivian.

If you’re following EVs and the factories that build them, the cheapest way to power yours is to make your own electricity. With electricity rates up almost 10% last year and expected to keep climbing, going solar is one of the best ways to protect yourself against rising costs. And with lease and PPA options, you can do it with zero upfront cost and start saving immediately. If you want to find the best deal, check out EnergySage. It’s a free service with hundreds of pre-vetted installers competing for your business, so you save 20 to 30% compared to going it alone. No sales calls until you pick an installer. Get your free quotes here.


Add Electrek as a preferred source on Google
Add Electrek as a preferred source on Google

FTC: We use income earning auto affiliate links. More.



Source link

See also  This Montréal airport now has 120 EV chargers, with 48 more on the way
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Sofia

Related Posts

Mercedes’ EV Charging Network Hit 100 Locations After 3 Years In The U.S.

November 10, 2026

Unit1 FARO and Neon review: I just found my new favorite e-bike helmets

November 10, 2026

PlugShare Gets A Major Redesign, Adds Dark Mode And iPhone Duo Support

November 10, 2026

CAT puts century-old train tech to work in its biggest underground machine yet

November 10, 2026

Polestar’s Next EVs Will Borrow From This Gorgeous New Concept

November 10, 2026

Honda shows off its next electric motorcycle, and it’s wilder than you thought

November 10, 2026
Leave A Reply Cancel Reply

Top Posts

Mercedes’ EV Charging Network Hit 100 Locations After 3 Years In The U.S.

November 10, 2026

Unit1 FARO and Neon review: I just found my new favorite e-bike helmets

November 10, 2026

PlugShare Gets A Major Redesign, Adds Dark Mode And iPhone Duo Support

November 10, 2026
Latest Reviews
Reviews

The Suzuki That Punches Harder Than Anything At Its Price

By SofiaNovember 10, 2026
Reviews

The Motorcycle That Helps New Riders Build Confidence Instead Of Testing It

By SofiaNovember 9, 2026
Reviews

Why Some Riders Would Be Better Off Renting A Touring Bike Instead Of Buying One

By SofiaNovember 8, 2026

Subscribe to Updates

Get the latest creative news from Motor Fortune about Electric Cars, Luxury Cars, design and More.

Most Popular

2022 Infiniti QX50 ups standard features, starts at $40,025

January 6, 2023

This Startup Is Turning Used E-Bike Batteries Into Affordable Energy Storage

November 4, 2026

What Happens When a Tesla Is No Longer Drivable

May 24, 2025
Subscribe

Subscribe to Updates

Get the latest creative news from Motor Fortune about Electric Cars, Luxury Cars, design and More.

Facebook X (Twitter) Instagram Pinterest YouTube
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Almaville Media.

Type above and press Enter to search. Press Esc to cancel.