Close Menu
  • News
  • Featured
  • Electric Cars
  • Luxury Cars
  • Reviews
  • Advice

Subscribe to Updates

Get the latest creative news from Motor Fortune about Electric Cars, Luxury Cars, design and More.

What's Hot

Iceland’s first wind farm comes with a water-saving bonus

November 17, 2026

Tesla changes vehicle computers from ‘AI’ to ‘SI,’ reflecting President Trump change

November 17, 2026

How Does The REO Runabout Stack Up Against Slate?

November 17, 2026
Facebook X (Twitter) Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
Facebook X (Twitter) Instagram
Motors MachineMotors Machine
  • News
  • Featured
  • Electric Cars
  • Luxury Cars
  • Reviews
  • Advice
Motors MachineMotors Machine
Electric car

Iceland’s first wind farm comes with a water-saving bonus

SofiaBy SofiaNovember 17, 2026No Comments6 Mins Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit Email
Share
Facebook Twitter LinkedIn Pinterest Email


Iceland first wind farm

Photographer Hreinn Hjartarson

Iceland’s first utility-scale wind farm comes with a useful perk: When the wind picks up, its hydropower reservoirs can save water for later.

Vaðölduver Wind Farm plugs straight into the existing Búrfell hydropower infrastructure, sharing 220 kV transmission lines, substations, and access roads. And Iceland’s windiest months coincide with the time of year when less water flows into its reservoirs.

Landsvirkjun, Iceland’s national power company, officially commissioned Vaðölduver on September 15, 2026. The first 14 turbines are online; another 14 will be installed in a second phase, and the entire wind farm is expected to be operating by the end of 2027.

Once complete, Vaðölduver will have 120 megawatts (MW) of capacity. When I met with the folks at Landsvirkjun in Reykjavik last month, they told me that’s enough to power the equivalent of 90,000 Icelandic households. Vaðalda’s electricity feeds into the grid and is sold through power purchase agreements.

Advertisement – scroll for more content

More wind, less pressure on water

Photographer Hreinn Hjartarson

Vaðölduver sits on a lava-and-sand plain east of the Þjórsá River, south of Sultartangi Dam. Landsvirkjun already operates seven hydropower stations in the surrounding Þjórsá and Tungnaá region.

The wind farm was sited in this region of Iceland because the seasons line up nicely.

The winds are strongest in winter, when inflows into hydropower reservoirs can be low. In summer, wind speeds tend to drop, but glacial melt increases water availability for the hydropower system.

When the wind turbines are generating plenty of electricity, Landsvirkjun can ease off hydropower and leave more water in its reservoirs. When the wind drops, hydropower can pick up more of the demand.

That gives the utility more control over when it uses its stored water and helps that water go further.

Plenty of wind closer to the ground

German wind turbine maker Enercon manufactured Vaðölduver’s turbines. The project also includes a service and maintenance agreement with Enercon.

Landsvirkjun had a decade of experience operating pilot wind turbines before building Vaðölduver. One big thing they learned: They didn’t need tall towers to find plenty of wind.

There’s little vegetation or other surface obstructions across this unique, exposed landscape. That allows the turbines to capture productive winds closer to the ground than they could at a more wooded or sheltered location.

“Lower” is relative, of course. The turbines still reach 150 meters (492 feet) at their highest blade tip.

The wind farm covers 17.1 square kilometers (6.6 square miles). Twenty-five turbines are rated at 4.26 MW each, and the remaining three at 4.5 MW. Landsvirkjun’s presentation puts annual generation at 440 GWh and lists a P50 net efficiency figure of 43%, which is considered strong for onshore wind.

A third pillar for Iceland’s power supply

The ability to tap into existing infrastructure was a major factor in Landsvirkjun’s site selection. Where a wind farm goes affects its cost, its environmental footprint, and the people who live nearby.

Landsvirkjun also identifies active engagement with communities and other stakeholders as essential to building wind projects. At Vaðölduver, the immediate task is to finish the remaining 14 turbines while the first phase completes its trial runs.

The company sees wind as a potential third pillar of Iceland’s electricity supply alongside hydropower and geothermal. Vaðölduver shows how those resources can work together, with wind adding generation while helping conserve stored water.

Electrek’s Take

Iceland is a world leader in clean energy. It generates nearly 100% of its electricity from renewable sources, combining hydropower fueled by glacial runoff and rivers (around 70%) and geothermal energy (around 30%).

Over 90% of Icelandic households use direct geothermal hot water for space heating and hot water, while the remaining homes use renewable electricity.

But it’s got the same grid capacity challenges as every other country. Adding wind – and anything else that uses power – means paying close attention to what the grid can handle. Iceland has an isolated transmission system, so maintaining stability and ensuring sufficient capacity are increasingly important as the country develops more projects.

While in Reykjavik, I met with the Minister of the Environment, Energy and Climate, Jóhann Páll Jóhannsson, who told me that the Icelandic grid’s capacity is expected to grow from 20 TWh to 24-25 TWh within a decade. Jóhannsson also said that he is pro-data center and that investors are keen to establish more of them in the country.

When I asked Jóhannsson and his team, as well as the teams at Landsvirkjun and publicly owned ON Power, Iceland’s second-largest electricity generator and largest EV charger network, about grid expansion plans to handle that pipeline, they all said that legislative reforms were being passed to speed up energy permitting processes. There is also financing in place to grow the grid. The physical transmission network is being expanded, but the process is slow because NIMBYism is creating bottlenecks.

In learning about new and completed Icelandic power projects during my visit, it was apparent that the companies in the power and geothermal heat sector regularly collaborate on projects – everyone brings their expertise to the table and works for the common good (yes, really).

But what was striking in discussions about grid expansion was that there seemed to be no plans to pitch in with the Icelandic transmission system operator (TSO), Landsnet hf. It seemed that the plan was to let the TSO come up with the solutions on its own. At most, Jóhannsson’s team said its legislative reform “opened the door” to possible grid innovations.

When I asked the Landsvirkjun team whether they were considering working with the TSO on distributed energy resource (DER) projects like virtual power plants and onsite battery storage for its heavy-industry clients, which make up 80% of its business, they said they hadn’t considered it.

Iceland has earned its reputation as a clean energy leader. Bringing that same collaborative and creative approach to expanding its grid would help it keep setting an example for the rest of the world.

Read more: Renewables to reach 40% of total generating capacity, beat gas within a year – EIA


If you’ve ever considered going solar, make it easy by finding a trusted, reliable solar installer near you that offers competitive pricing by checking out EnergySage. It has hundreds of pre-vetted solar installers competing for your business, ensuring you get high-quality solutions and save 20-30% compared to going it alone. Plus, it’s free to use, and you won’t get sales calls until you select an installer and share your phone number with them. 

Your personalized solar quotes are easy to compare online, and you’ll get access to unbiased Energy Advisors to help you every step of the way. Get started here.


Add Electrek as a preferred source on Google
Add Electrek as a preferred source on Google

FTC: We use income earning auto affiliate links. More.



Source link

See also  EcoFlow flash sale offers 5,018Wh TITAN Classic + 4x rigid solar panels $1,588 off, Hiboy EVs up to 45% off from $300, more
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Sofia

Related Posts

Tesla changes vehicle computers from ‘AI’ to ‘SI,’ reflecting President Trump change

November 17, 2026

How Does The REO Runabout Stack Up Against Slate?

November 17, 2026

Tesla just doubled its Miami Robotaxi geofence

November 17, 2026

EcoFlow flash sale offers 5,018Wh TITAN Classic + 4x rigid solar panels $1,588 off, Hiboy EVs up to 45% off from $300, more

November 17, 2026

DJI Made A Commuter E-Bike. I Tested It, And It's Really, Really Good

November 17, 2026

Volkswagen is cooking up a ‘spicy’ new electric hot hatch

November 17, 2026
Leave A Reply Cancel Reply

Top Posts

Iceland’s first wind farm comes with a water-saving bonus

November 17, 2026

Tesla changes vehicle computers from ‘AI’ to ‘SI,’ reflecting President Trump change

November 17, 2026

How Does The REO Runabout Stack Up Against Slate?

November 17, 2026
Latest Reviews
Reviews

Ford’s Expedition Tremor Overland Concept Is Foxy In More Ways Than One

By SofiaNovember 17, 2026
Reviews

Touring Motorcycles That Make Cross-Country Riding Look Easy

By SofiaNovember 16, 2026
Reviews

Smallest V-Twin Motorcycles On Sale In 2026

By SofiaNovember 15, 2026

Subscribe to Updates

Get the latest creative news from Motor Fortune about Electric Cars, Luxury Cars, design and More.

Most Popular

This Chinese Luxury Brand Wants To Take Europe By The End Of The Year

September 11, 2026

Ontario airport set to spend $5.5 million on electric ground support equipment

August 28, 2026

This New Electric Paver Can Lay Down 1,200 Tonnes Of Asphalt A Day

November 11, 2026
Subscribe

Subscribe to Updates

Get the latest creative news from Motor Fortune about Electric Cars, Luxury Cars, design and More.

Facebook X (Twitter) Instagram Pinterest YouTube
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Almaville Media.

Type above and press Enter to search. Press Esc to cancel.